Name: Andrew Edler
Date: 7/18/99
Project Title: Date Stamper
Sponsor: Benteler Automotive
Major Accomplishments Since Last Report:
-
The cylinder has been temporarily clamped to the table in order to make
some trial runs.
-
The cylinder and clamps have been cycled and are working properly.
( We had to open up the ports on the stamping cylinder to get a lower cycle
time out of it.)
-
Our light curtain has been mounted and is working properly. The brackets
to which the curtain is mounted need to be permanently attached to the
table.
-
A reinforcing bracket has been made for the beam clamp on the stamping
end of the tooling.
-
A longer extension has been made between the stamping cylinder rod and
the stamping head.
Major Problems to Date:
NONE
Objectives:
-
Get the air cylinder permanently mounted to the base plate.
-
Get the light curtain permanently mounted to the table.