Name: Andrew Edler
Date: 5/16/99
Project Title: Date Stamper
Sponsor: Benteler Automotive
Major Accomplishments Since Last Report:
-
Steel for the demonstration table came in.
-
The majority of the steel is cut to length and assembly of
the table has begun.
Major Problems to Date:
-
We need to do some more testing with various air cylinder
bore diameters in order be sure of the correct size to use. We believe
that we'll need a bore diameter of 3.5".
-
We need to determine the syle of stamping head and character
holder to use. We need to find a character holder able to hold up
to 8 characters although only 5 may be used.
Objectives:
-
Finish assembly of the demonstration table.
-
Aquire some air cylinder samples and do some testing ASAP.
-
Decide on a stamping head and character set and get them
ordered.