Name: Andrew Edler
Date: 6/13/99
Project Title: Date Stamper
Sponsor: Benteler Automotive
Major Accomplishments Since Last Report:
-
The regulators, filters, and lubricators for our pneumatic system have
been mounted in our sealed box.
-
The sealed box has been mounted to our demonstration table.
-
We've decided that the cylinder will be mounted to the bottom of the base
plate.
-
An air cylinder has been ordered and should be arriving in the next few
days.
-
Part of the new tooling has been mounted on the base plate.
Major Problems to Date:
-
We need to do some more testing with various air cylinder bore diameters
in order be sure of the correct size to use. We believe that we'll
need a bore diameter of 3.5" because of some crude testing done in the
past.
Objectives:
-
Acquire air cylinder samples and do some testing.
-
Run the wiring from our control box to the solenoid valves.
-
Get the remaining tooling mounted to the base plate.